|
1. Train goes past the siding to the right (Step
1), backs the railcar into the siding (Step 2) and uncouples.
2. The engine comes out of the siding to the right (Step 3), backs
past the siding towards Edmonton (Step 4), goes forward into the
siding (Step 5) and pulls the railcar out (Step 6). The railcar is now
facing the correct way but the engine isn’t.
3. The engine pushes the railcar past the siding to the right (Step
7), decouples, and the engine backs into the siding (Step 8).
4. The engine leaves the siding towards Edmonton (Step 9) - it is now
facing the correct way - and backs up and connects with the railcar
(Step 10). Now the train is successfully heading towards Edmonton
(Step 11). |
|